FTW453 – Physical Readiness Field House at Fort Wainwright

Project Scope: Design-build of a 39,936 square foot physical readiness field house for the U.S. Army Corps of Engineers, featuring a 19,890 square foot mezzanine running track, multi-purpose turf field, locker rooms, weight room, and administrative offices.

Key Features:

HVAC Systems:

  • Variable Air Volume (VAV) heat recovery ventilators for optimal energy efficiency
  • Individual fans cooling the mechanical/electrical room and providing building air pressure relief
  • Space heating powered by steam from the Fort Wainwright district heating system
  • Non-toxic 50% propylene glycol solution for reliable freeze protection
  • Strategically placed unit heaters in vestibules, equipment, and storage rooms; re-heat coils, baseboard, and radiant floors throughout public areas
  • Outdoor air-cooled chiller with non-toxic 40% propylene glycol solution and chilled water coils for year-round comfort cooling

Plumbing & Mechanical Systems:

  • Duplex steam-to-water domestic water heaters for continuous hot water supply
  • Pumped hot water recirculation system for instant availability
  • Comprehensive drainage system including roof drains, overflow drains, and storm water piping discharging to drainage swails
  • Building waste piping connection to base sewer system

Project Highlights: This facility provides a comprehensive fitness and readiness hub for soldiers stationed at Fort Wainwright, incorporating climate-resilient heating and cooling systems to ensure reliable, energy-efficient operation in one of Alaska’s most demanding environments.