GOVERNMENT / MECHANICAL

Fort Wainwright

336C Vehicle Maintenance

ROLE: Mechanical Contractor
CLIENT: U.S. Army Engineer District
PRIME CONTRACTOR: Watterson Construction
LOCATION: Fort Wainwright Alaska

Information about the project: In 2010, construction of the Ft. Wainwright Vehicle Maintenance Facility began. The 75,000 sq. ft. project entailed the installation of steam-heated glycol systems, plumbing systems including drain waste, and an oil-water separator unit. Roof drains, piping systems, compressed air systems, vehicle lubrication, and complete ventilation systems using rooftop air handling units, along with vehicle exhaust systems, were completed.

Slayden’s role on the project consisted of:

  • Domestic Water System
  • Sewer System
  • Steam and Condensate System
  • Hydronic Heating System
  • Insulation
  • Controls
  • TAB
  • Extensive Commissioning
  • Seismic anchor and restraint design and implementation