GOVERNMENT / MECHANICAL
Clear 84 Person Dormitory
| ROLE: | Subcontractor |
| CLIENT: | U.S. Army Corps of Engineers |
| PRIME CONTRACTOR: | Unit Company |
| LOCATION: | Clear Alaska |
Information about the project:
CLR049 – 84-Person Dormitory at Clear Space Force Station
Project Scope: Design-build of a modern three-story dormitory facility totaling 38,981 square feet, featuring an enclosed and heated 200-foot connector link to existing base facilities.
Key Features:
HVAC Systems:
- Variable Air Volume (VAV) heat recovery air handlers with terminal units for optimal energy efficiency
- Hydronic heating system integrated with the facility’s existing steam infrastructure
- Backup oil-fired boilers with non-toxic 50% propylene glycol solution for reliable freeze protection
- Strategically placed re-heat coils, baseboard units, and unit heaters throughout the facility
- Air-cooled chiller system with propylene glycol solution for year-round climate control
Plumbing & Mechanical Systems:
- Steam-fired water heaters with backup indirect-fired units ensuring continuous hot water supply
- Pumped hot water recirculation system for instant availability
- Comprehensive drainage system including roof drains, overflow protection, and rainleader piping
- Gravity sanitary sewer connection to base infrastructure
- Complete insulation on all pipe and duct systems for maximum efficiency in extreme Alaskan conditions
Project Highlights: This facility provides comfortable, energy-efficient housing for military personnel in one of Alaska’s most challenging climates, incorporating redundant systems to ensure uninterrupted operation year-round.